66400501Installation, Operating andServicing InstructionsHM 60 N / 70 N / 100 N / 150 JUMBOHM 60 N / 70 N / 100 NWith ACV BG 2000-S premix gas burnerH
9INSTALLATIONBalanced flue boiler connection type: C• C13: concentric horizontal connection• C33: concentric vetical connection• C53: parallel chimney
10INSTALLATIONExample of heating + storage connectionRecommended for applications requiring a high peak flow.Example of series connectionPreferable fo
11INSTALLATIONHEATING CONNECTIONThe HeatMaster has two connections at the rear that can be used toconnect a central heating circuit. Connecting a heat
12ELECTRICAL CONNECTIONSPower supplyThe boiler operates with a 230 V - 50 Hz single phase supply.A double pole isolator with a 6 amp fuse or a 6 amp M
13INSTALLATION1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20L1 N T1 T2 S3 B4L1 N T1 T2 S31 3 54211212220/240V~ 50 HzphnC21CCC1A2A1A1A2116195441617
FILLING THE HOT WATER AND HEATING CIRCUITSIMPORTANTHot water tank must be pressurised before the heatingcircuit is filled.1. Close the primary circuit
15BURNER FEATURESACV BG 2000-S PREMIX GAS BURNERSDescriptionThe burner tube is coated with metal fibre (NIT) which, in addition toits remarkable heat
16B. BlueBk. BlackBr. BrownG. GreyGr. GreenY. YellowY/Gr. Yellow / GreenElectrical connectionsB. BlueBk. BlackBr. BrownG. GreyGr. GreenY. YellowY/Gr.
17BURNER FEATURESIgnition electrodeBurner tubeGas valveVenturiIonisation probeBurner chamber plate insulationIgnition electrodeBurner tubeGas valveVen
18BURNER FEATURESHeatMaster 60, 70 and 100 Gas burner features - BG 2000HM 60 N HM 70 N HM 100 N HM 100 N HM 150 Jumbo+ BG 2000-S/60 + BG 2000-S/70 +
1INTENDED USERS OF THESE INSTRUCTIONSThese instructions are intended for- specifying engineers- installing engineers- end-users- servicing engineersSY
19BURNER FEATURESACV BM 101 AND BM 151 OIL BURNERSDescriptionThe use of new technology enables our medium output burners tomeet current performance an
20SERVICE INTERVALSACV recommends that boilers should be serviced at least once a year.The burner must be serviced and tested by a competent engineer.
21MAINTENANCESERVICING THE SAFETY DEVICES- Check that all thermostats and safety devices are working properly.- Test the safety valves on the central
22USER GUIDEUSING THE BOILERYour system should be serviced at least once a yearby a qualified engineer.If the boiler is subject to heavy use, it may r
BAHeatMaster 150 Jumbo23USER GUIDEHeating system pressureFrom time to time you may need to top up the heatingsystem pressure.This pressure is indicate
24USER GUIDERESETTING THE PRESSURE JET OIL OR GASBURNER• HM 60 N and HM Jumbo 150➠ the lockout indicator is situated on the burner.• HM 70 N and 100
25SERVICE RECORDDate installed :% CO2 (min. load) :% CO2 (max. load) :Gas LPGOilModel :Serial number :Heating system pressure setting :❏❏❏Name and sig
26SERVICE RECORDDate serviced :% CO2 (min. load) :% CO2 (max. load) :Gas LPGOilRemarks :❏❏❏Name and signature :Flue gas T° :Efficiency :Gas pressure :
27SERVICE RECORDDate serviced :% CO2 (min. load) :% CO2 (max. load) :Gas LPGOilRemarks :❏❏❏Name and signature :Flue gas T° :Efficiency :Gas pressure :
28SERVICE RECORDDate serviced :% CO2 (min. load) :% CO2 (max. load) :Gas LPGOilRemarks :❏❏❏Name and signature :Flue gas T° :Efficiency :Gas pressure :
2DESCRIPTIONOPERATING PRINCIPLEThe HeatMaster is a high performance, direct fired hot water storageheater, which has indirect heat transfer due to its
INTERNATIONALACV international n.vKERKPLEIN, 39B-1601 RUISBROEK - BELGIUMTEL.: +32 2 334 82 20FAX: +32 2 378 16 49E-MAIL: international.info@acv-world
3DESCRIPTIONThermal reset highlimit thermostatManual reset highlimit thermostatPrimary safety valveLow waterpressure switchControl thermostatDomestic
4DESCRIPTIONThermal reset highlimit thermostatManual reset highlimit thermostatPrimary safety valveLow waterpressure switchControl thermostatThermal r
5TECHNICAL SPECIFICATIONMAXIMUM OPERATING CONDITIONSMaximum service pressure (tank full of water)- Primary circuit: 3 bar- Secondary circuit: 10 barTe
6TECHNICAL SPECIFICATIONDIMENSIONSThe units are delivered fully assembled, tested and packed on a timber base with shockproof edges and protected by h
7TECHNICAL SPECIFICATIONDGFEJHBKACDACC/2AKHJECDFG562HeatMaster 150 JumboHeatMaster 70 N and HeatMaster 100 NWithout burner With ACV BG 2000-Spremix ga
8BOILER ROOMImportant•Keep vents free at all times.• Do not store inflammable products in the boiler room.• Do not store corrosive products near the
Kommentare zu diesen Handbüchern